Skip to main content

Box 1

 Container

Contains 14 Results:

Site Operations Plan: Addendum 1 (September 1988), 1988

 File — Box: 1, Folder: 8
Scope and Contents From the Series:

These files are the project plans for the Butterworth Landfill site. These are building plans that the EPA produced, as well as contingency plans if the site had an emergency or if the site had unforeseen difficulties.

Dates: 1988

Site Operations Plan: Appendix A – Field Laboratory Methodology for Metals Screening of Soil Samples (October 1987), 1987

 File — Box: 1, Folder: 9 – 11
Scope and Contents From the Series:

These files are the project plans for the Butterworth Landfill site. These are building plans that the EPA produced, as well as contingency plans if the site had an emergency or if the site had unforeseen difficulties.

Dates: 1987

Wetlands Assessment (August 1991), 1991

 File — Box: 1, Folder: 13
Scope and Contents From the Series:

These are assessments were done by the EPA in various instances at the Butterworth Landfill site. Some of the things of interest to them were the toxcicity of the groundwater or the health risk that the site posed to nearby residents.

Dates: 1991

EPA News Release: EPA Seeks Public Comments on the Proposed Consent Decree for Butterworth Landfill (March 1987), 1987

 File — Box: 1, Folder: 14
Scope and Contents From the Series:

The other documents are still of importance to the Butterworth Landfill site, but do not have any discernible connection to the rest of the collection.

Dates: 1987