Box 3

 Container

Contains 64 Results:

Site Operations Plan Revision 2 (October 1987), 1987

 File — Box: 3, Folder: 3 – 4
Scope and Contents From the Series:

These files are the project plans for the Butterworth Landfill site. These are building plans that the EPA produced, as well as contingency plans if the site had an emergency or if the site had unforeseen difficulties.

Dates: 1987

Hydro geological Work Plan: Addendum 2 (January 1991), 1991

 File — Box: 3, Folder: 5
Scope and Contents From the Series:

These files are the project plans for the Butterworth Landfill site. These are building plans that the EPA produced, as well as contingency plans if the site had an emergency or if the site had unforeseen difficulties.

Dates: 1991

Quality Assurance Project Plan (September 1987), 1987

 File — Box: 3, Folder: 9
Scope and Contents From the Series:

These files are the project plans for the Butterworth Landfill site. These are building plans that the EPA produced, as well as contingency plans if the site had an emergency or if the site had unforeseen difficulties.

Dates: 1987

Sediment Sampling Work Plan: Addendum 3 (February 1991), 1991

 File — Box: 3, Folder: 10
Scope and Contents From the Series:

These files are the project plans for the Butterworth Landfill site. These are building plans that the EPA produced, as well as contingency plans if the site had an emergency or if the site had unforeseen difficulties.

Dates: 1991

Final Revised Community Relations Plan (October 1991), 1991

 File — Box: 3, Folder: 71
Scope and Contents From the Series:

These files are the project plans for the Butterworth Landfill site. These are building plans that the EPA produced, as well as contingency plans if the site had an emergency or if the site had unforeseen difficulties.

Dates: 1991

National Oil and Hazardous Substances Pollution Contingency Plan: Final Rule; 40 CFR Part 300 (March 8, 1990), 1990

 File — Box: 3, Folder: 45 – 46
Scope and Contents From the Series:

These files are the project plans for the Butterworth Landfill site. These are building plans that the EPA produced, as well as contingency plans if the site had an emergency or if the site had unforeseen difficulties.

Dates: 1990

John Ball Park Community Association Comments on the Remedial Investigation and Endangerment Assessment (June 1990), 1990

 File — Box: 3, Folder: 6
Scope and Contents From the Series:

These are assessments were done by the EPA in various instances at the Butterworth Landfill site. Some of the things of interest to them were the toxcicity of the groundwater or the health risk that the site posed to nearby residents.

Dates: 1990

Understanding Superfund Risk Assessment (July 1992), 1992

 File — Box: 3, Folder: 69
Scope and Contents From the Series:

These are assessments were done by the EPA in various instances at the Butterworth Landfill site. Some of the things of interest to them were the toxcicity of the groundwater or the health risk that the site posed to nearby residents.

Dates: 1992

Human Health Risk Assessment (May 1991), 1991

 File — Box: 3, Folder: 73 – 74
Scope and Contents From the Series:

These are assessments were done by the EPA in various instances at the Butterworth Landfill site. Some of the things of interest to them were the toxcicity of the groundwater or the health risk that the site posed to nearby residents.

Dates: 1991

Preliminary Health Assessment, 1989

 File — Box: 3, Folder: 75
Scope and Contents From the Series:

These are assessments were done by the EPA in various instances at the Butterworth Landfill site. Some of the things of interest to them were the toxcicity of the groundwater or the health risk that the site posed to nearby residents.

Dates: 1989