Skip to main content

Box 4

 Container

Contains 1 Result:

Revised Final Design Remedial Design Project Plan: Volume 1 (February 1998), 1998

 File — Box: 4, Folder: 34 – 36
Scope and Contents From the Series:

These files are those that the EPA had produced when their plans had been forced to change. This could have been because of financial constraints, unforeseen obstacles in construction, or changes in regulations.

Dates: 1998